Correction
Slip No. 4 Dated 26.05.2003:
The following New Paragraph No. 4.6.8 (iv) is added under Para
4.6-“Precautions” of Chapter 4 of IRTMM-2000-Rules for movement and working
Track Machines as under.
4.6.8(iv)
“The vertical and lateral clearance for OHE, Signal post and any other structure should be checked and adjusted before clearing the block. It shall be insured by supervisor working with track machine that there should be no infringement to Signal post, OHE and any other Structure as per schedule of dimensions”
Authority: Board’s
office’s letter No. 2000/Track-III/TK/18 dated 26.5.2003.